Harbor Assistance Program projects


Year of Award
Community
Project
HAP Share
1980 Milwaukee Dredging of Harbor - Phase I $ 815,085
1981 Kenosha North Dockwall Repair 32,614
1981 Milwaukee Dredging of Harbor - Phase II 338,388
1981 Superior Dredging and disposal 1,008,000
1982 La Crosse Construction of Barge Dock and Two Pile Clusters 116,421
1982 Manitowoc Dredging - Manitowoc Channel Extension 38,500
1982 La Pointe (Madeline Island) Harbor Dredging, Pier and Breakwater Construction 540,928
1982 Marinette Construction of Menominee River Dockwall 1,070,800
1983 Milwaukee Installation of Flexible Fenders on Terminal Dockwalls in Outer Harbor 566,160
1984 Kenosha Repair of South Dock 273,945
1985 Superior Rehabilitation of Dockwall 1,758,600
1986 Green Bay Repair of Containment Dike Wall (Phase I) 34,955
1986 Green Bay Repair of Containment Dike Wall (Phase II) 60,279
1987 Milwaukee Heavy-Lift Dock Repair 184,000
1987 Milwaukee Dock Repairs to Piers 1 and 5 395,000
1987 Iron County Bank Erosion Repair 25,000
1987 Red Cliff Fishing Dock Expansion 169,000
1988 Cassville Purchase Ferry Vessel 100,000
1988 La Crosse Preparation of Fleeting Site at Isle LaPlume 176,500
1988 Prairie du Chien Repairs to Mooring Pilings 20,000
1989 Milwaukee Rehabilitation of South Slip One Apron 960,000
1989 La Crosse Repairs to North-Side Dock 20,000
1990 Milwaukee Rehabilitation of South Pier 1 Apron (North Side) 1,040,000
1990 Green Bay New Dock Construction 1,540,000
1991 Milwaukee Emergency Repair of Bulk Dock Anchorage 292,000
1991 La Pointe Resurfacing of Ferry Dock 160,000
1992 Milwaukee Rehabilitation of South Pier 1 Apron (South Side) 880,000
1992 Green Bay Modification of Disposal Facility 85,920
1993 Door County Construction of Breakwater and dredging at Northport 2,230,000
1994 Green Bay Dock Rehabilitation 2,295,200
1994 Milwaukee Dock Rehabilitation 1,000,000
1994 Town of Bell Commercial Fishing Dock Rehabilitation 204,800
1995 Milwaukee Dock Rehabilitation 800,000
1995 Green Bay Dock Rehabilitation 3,600,000
1996 La Crosse County Fleeting Site Construction 398,400
1997 Green Bay Expansion of Disposal Site 1,285,109
1997 Marinette Dock Rehabilitation 1,987,416
1997 Door County Extension of Breakwater 227,136
1998 Milwaukee Port Road/Rail Rehabilitation 600,000
1999 Milwaukee Dredging  800,000
1999 Marinette Reconstruction of dockwall and dredging 4,000,000
2000 La Pointe Reconstruction of a Ferry Ramp Apron 256,800
2000 Town of Campbell Dockwall and Launch Facility 996,500
2002 Milwaukee Dockwall Rehabilitation 1,000,000
2002 La Pointe Dockwall Relocation 200,000
2003 Sturgeon Bay Dockwall Rehabilitation 1,136,000
2003 Manitowoc Dockwall Construction 2,830,077
2004 Milwaukee High-speed ferry preparations 800,000
2004 Green Bay Oil dock repairs 249,956
2004 Sturgeon Bay Dockwall repairs 1,200,000
2005 Sturgeon Bay Dry dock improvement 6,000,000
2005 Superior Dockwall repairs 1,078,400
2005 Oconto Dredging 1,100,000
2005 Green Bay Dockwall repairs 2,801,180
2006 Manitowoc/Burger Boat Launch well construction 1,166,390
2006 Superior Dockwall repairs 1,770,650
2006 Milwaukee CDF expansion 1,488,000
2007 Milwaukee Liquid cargo pier repairs 1,200,000
2007 La Pointe Emergency dredging 104,000
2008 Manitowoc/Burger Boat Dockwall repairs, dredging and launch access paving 2,304,102
2008 Superior  Dockwall repair 1,360,000
2008 Milwaukee Dockwall repair 480,000
2008 La Crosse/Brennan Dockwall repairs and dredging 2,256,800
2009 Superior Fraser Shipyards dock repair 3,722,636
2009 Superior Gavilon Grain dock repair 2,040,000
2009 Sister Bay/Sand Bay Dock Dock repair and dredging 107,200
2009 Oconto Dock wall repair and extension 1,416,000
2009 Milwaukee Ballast water treatment pilot projects 2,167,200
2010 Manitowoc Dock wall repair and dredging 3,471,798
2010 Green Bay/US Oil Liquid bulk loading facility and dredging 1,945,880
2010 Green Bay Cat Islands restoration 7,141,835
2011 Milwaukee Edward E. Gillen Company dock wall repair and expansion 1,842,000
2011 Superior Hallett Dock Company dredging and dock wall repair 3,332,269
2011 Two Rivers City of Two Rivers dredging 1,630,950
2012 Noble Petro Milwaukee facility vapor combustor unit 720,000
2012 Sheboygan County Sheboygan dredging disposal 1,500,000
2012 Superior - BNSF/GM Emergency dock wall repair 4,744,000
2012 Cornucopia Town of Bell emergency dredging 99,720
2012 Washington Emergency final engineering for dredging 182,700
2013 Washburn Repair marine travel lift steel bin walls 500,000
2013 Racine Dredging marina at the mouth of the Root River 700,000
2013 Washington Dredging federal navigation channel to island 5,182,933
2013 Oconto Dredging the Oconto River 1,520,278
2013 Milwaukee - Southwind Marine Dockwall repair and construction of drydock on the Kinnikinnick River 1,955,864
2013 Manitowoc - City Centre Dredging Upper Manitowoc Harbor for large vessel access 278,978
2013 Manitowoc - St. Mary's Cement Dredging Upper Manitowoc Harbor federal navigation channel 475,990
2013 Green Bay - Noble Petro Dockwall repair and improvements for petroleum shipment 2,285,957
       
    TOTAL $112,873,199

Questions about the content of this page:
Sheri Walz, sheria.walz@dot.wi.gov
Last modified: June 10, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.