skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
News
 
Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Work on WIS 100/Mayfair Road to begin in Milwaukee County

February 27, 2014

The Wisconsin Department of Transportation (WisDOT) will begin resurfacing of WIS 100/Mayfair Road between Silver Spring Drive and Burleigh Street. WisDOT will begin work on Monday, March 3. The work is expected to continue until late fall.

The current condition of the roadway pavement is highly deteriorated. On WIS 100, the pavement will be resurfaced, traffic signals will be upgraded, and some medians will be updated to add left-turn lanes.

During construction on WIS 100, from Burleigh to Capitol Drive, two lanes of traffic will be open in each direction during construction with turn lanes provided at signalized intersections. From Capitol to Silver Spring Drive, one lane of traffic will be open in each direction with turn lanes provided at signalized intersections. At night, one lane of traffic will be open in each direction for the entire length of the project and turn lanes may be closed during that time of day.

On Silver Spring Drive near the intersection, the pavement will be replaced. A sidewalk will be added to the north side of the road.

WisDOT is asking motorists to allow for additional time and remain alert and to use caution in the construction zone. It will take some time for drivers to adjust to the new patterns and some delays are expected. For current traffic conditions, visit Wisconsin 511 online.

For more information, contact
Brian DeNeve, WisDOT SE Region Communications
(262) 548-8759, brian.deneve@dot.wi.gov

 

Events

WisDOT radio newsline

Other news releases:

Law of the month

Public hearings and meetings

WisDOT media contacts