Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

US 12 Corridor - Contacts

Traffic congestion on US 12 at Lexington Boulevard.
New urban growth has led to higher traffic volumes at the Lexington Boulevard intersection on US 12.

Note - WisDOT has stopped all work on the study of a future US 12 Bypass through the town of Koshkonong south of Fort Atkinson. The final disposition of the study will be determined at a future date by the Transportation Projects Commission. (May 3, 2012)

Larry Barta, WisDOT Project Manager
(608) 246-3884
larry.barta@dot.wi.gov

Michael Bie, WisDOT Southwest Region Communications Manager
(608) 246-7928
michael.bie@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Southwest Region, Madison Office
2101 Wright St.
Madison, WI 53704
Phone: (608) 246-3800
Fax: (608) 246-3843
TTY: 711
Email: swr.dtsd@dot.wi.gov

Questions about the content of this page, contact:
WisDOT Southwest Region Office-Madison, swr.dtsd@dot.wi.gov
Last modified: June 18, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.