US 12 Corridor Study at Fort Atkinson - Schedule

For more information on public information meetings (PIM), hearings and other public activities, visit Public involvement.

Current

2011

  • Announcement of Preferred Alternative, South Bypass
  • Completion of impacts analysis of south bypass, preparation of FEIS

Future

  • 2012 - Publication of the Final Environmental Impact Statement (FEIS), Record of Decision (ROD) signed and study is scheduled to be completed
  • 2012-2013 - Officially map future bypass corridor
  • 2016 - Interim improvements to existing US 12
  • To be determined (TBD) - When traffic and safety conditions warrant the need to construct the bypass, the EIS will be re-evaluated to account for any changes in conditions. This would be done before construction can begin.
  • TBD - A public hearing will be held prior to recording the official map

Past

2011

  • October 13, 2011 - PIM

2008

  • 2008-2011 - Impacts analysis of south bypass, preparation of FEIS

2007

  • December 2007 - Announcement of three step preferred concept
  • April-August 2007 - Additional studies, public and agency coordination, and alternatives analysis. PIM.
  • December 2006-April 2007 - Response to Draft EIS (DEIS) comments

2006

  • December 2006-April 2007 - Response to DEIS comments
  • January-December 2006 - Additional studies and agency coordination post-DEIS

2005

  • November 2005 - Public hearing
  • November 2003-November 2005 - Conduct studies and prepare DEIS on alternatives conducted for further study

2004

  • November 2004 - PIM

2003

  • November 2003-November 2005 - Conduct studies and prepare DEIS on alternatives conducted for further study
  • July-November 2003 - Analysis of broad range of alternatives
  • April 2003 - PIM
  • February-July 2003 - Develop purpose and need statement
  • September 2002-February 2003 - Agency and public scoping period

2002

  • October 2002 - PIM
  • September 2002-February 2003 - Agency and public scoping period
  • September 2002 - Notice of intent to prepare DEIS

Top Return to top



DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index | Site Survey