US 14 (WIS 92-US 12/18)

Need/purpose

Schedule

Maps

Environmental documents

Public involvement

Traffic impacts

Contacts

US 14 (WIS 92-US 12/18) - Completed projects

The following documents are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

  • 2012
    • Lacy Rd. overpass and McCoy Rd. interchange (Segment G), in Fitchburg (south of Madison) Note - This is city of Fitchburg project.
      • Constructed new full-diamond interchange between existing Lacy Rd. overpass and McCoy Rd. interchange.
      • In conjunction with the new interchange, southerly ramps of McCoy Rd. interchange was removed.
    • Reconstructed US 14/County MM interchange and the County MM and County M intersection (Segment D)
      • To address existing pavement degradation along County MM and the poor Level of Service (LOS) at the intersection of County MM, at the US 14 ramp terminals, and at County M, reconstructed the US 14/County MM interchange and the County MM and County M intersection.
      • Roundabout placed at each ramp terminal and at the County M intersection.
    • County M bridge reconstruction (Segment D), in Fitchburg (north of Oregon) Note - This is a county project.
  • 2011
    • Hill Rd. to Park St. (aka US 14/WIS 138 interchange) (Segment B) - Reconstructed the US 14/WIS 138 interchange and placed roundabouts at the ramp terminals to address capacity and operational issues at the interchange
    • US 14, US 18/151 to County MM (aka US 14, US 12/18 (Beltline) to County MM) (Segment C) - resurfaced to address pavement degradation
  • 2010
    •  Resurfaced 4-lane segment on McCoy Road in interchange area in preparation for the future Lacy Road project Note - This is city of Fitchburg project.
  • 2009
    •  US 14, County MM to WIS 138 (Segment A) - Expanded existing US 14 from two to four lanes to address capacity concerns
  • 2005
    •  Resurfaced US 14, US 14/WIS 138 interchange to WIS 92 (Segment H)

Project overview/locations

Map of US 14 Reconstruction project overview/locations and schedule.

back Back to Home

back Back to Maps


 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index