Verona Road/US 151 study - public involvement

Public meetings | Public hearings | News releases | Newsletters/handouts/other

Today more than ever, highway projects are developed as a cooperative effort between the public, state and federal review agencies, and WisDOT.

Preparing a project like Verona Road and the West Beltline from concept to actual construction takes many years.

During the needs assessment phase, WisDOT conducted extensive traffic modeling, public opinion polls, infrastructure deficiency surveys and coordination with local officials.

The conclusions from this needs assessment led WisDOT to initiate a subsequent study to look at alternative solutions to the identified needs. During that study, WisDOT worked closely with the cities of Madison and Fitchburg, neighborhoods, businesses and others that might be affected by the solutions.

Public information meetings (PIM)

Scheduled/future

  • There are no scheduled meetings to report on at this time.

Past meetings

Public hearings

  • May 17 and 18, 2004 - Release of the Draft Environmental Impact Statement (DEIS).

News releases

Newsletters/other

The following documents are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Top Return to top


 

 


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index