skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

US 151 corridor

County D to WIS 175 project

Schedule

Map

Public involvement

Contacts

County D to WIS 175 project

Improvements on US 151 between County D and WIS 175 include an interchange project and construction of a new four-lane roadway. 

A new interchange will be constructed at US 151 and County D to connect the new four-lane highway from Waupun with the Fond du Lac bypass. The project extends 1.7 miles and will be performed under traffic.

The interchange will include work on the following ramps:

  • Northbound off-ramp to westbound County D
  • Northbound off-ramp that will loop to eastbound County D
  • Southbound on-ramp at County D

A four-lane divided highway will be constructed to connect existing US 151 with the Fond du Lac bypass at WIS 175.  

Work includes:

  • Building an overpass at River Road.
  • Constructing an overpass at the Wildgoose Trail.
  • Constructing an interchange at Hickory Road.
  • Building an underpass at the Wisconsin Central Line railroad tracks.
  • Building a bridge over the east branch of the Fond du Lac River.


US 151 project map from County D to WIS 175.

 

 


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index