skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Claude Allouez Bridge project

Purpose

Selected alternative

Existing bridge condition

Environmental document

Public involvement

Construction progress

History

Contacts

Claude Allouez Bridge project

WisDOT has selected a bridge alternative to replace the aging Claude Allouez Bridge in downtown De Pere.

A bridge condition study in 1998 recommended the bridge be replaced prior to 2008-2010, noting that the bridge was built in 1932 and was beyond its service life. The report cites several problems with the current bridge:

  • A deteriorating deck.
  • Need for replacement of expansion joints.
  • Deteriorating structural steel girders.
  • Deteriorating piers.
  • Escalating maintenance costs.

The report also stated that an extensive overhaul of the Claude Allouez Bridge would not meet the needs of the traveling public through the year 2020.

In conjunction with the Claude Allouez Bridge replacement, WisDOT is also taking advantage of the opportunity to review ways to reduce local traffic congestion. A new bridge would:

  • Eliminate the maintenance costs on the current bridge.
  • Reduce traffic congestion in downtown De Pere.
  • Provide a durable, long-lasting bridge for years to come.


Overhead photo of the Claude Allouez Bridge and surrounding area.

 


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index