Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

South La Crosse Transportation Study - Project reports

The following document(s) are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Final Report

  • Executive summary
  • View final report (10.8 MB)
    • Executive summary
    • Table of contents
    • Sections
      • Section 1: Introduction
      • Section 2: Purpose and need
      • Section 3: Environmental scan
      • Section 4: Multi-modal facilities
      • Section 5: Land use/transportation plans
      • Section 6: Input and coordination
      • Section 7: Analysis of geometric deficiencies
      • Section 8: Traffic analysis
      • Section 9: Alternatives development
      • Section 10: Strategies and recommendations
      • Section 11: Summary
    • Appendices
      • Appendix A: Environmental scan
      • Appendix B: Previously recorded archeological sites
      • Appendix C: Hazardous materials sites
      • Appendix D: Telephone survey summary
      • Appendix E: Local business survey summary
      • Appendix F: Intersection turning movement count data
      • Appendix G: Urban segment five-year crash analysis

Questions about the content of this page, contact:
WisDOT Southwest Region Office-Madison, swr.dtsd@dot.wi.gov
Last modified: June 18, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.