US 8 - Final Environmental Impact Statement (FEIS)

The Wisconsin Department of Transportation (WisDOT) has completed the Final Environmental Impact Statement (FEIS) on 40 miles of US 8 between WIS 35 (North) and US 53 in Polk and Barron Counties. The FEIS identifies the selected preferred alternative for the corridor.

The US 8 study was initiated by legislative mandate to determine how to best meet the long-term transportation needs of this corridor. Alternatives for the corridor include improvement of the existing route to a four-lane highway as well as potential bypasses of Turtle Lake and Barron and realignments in several locations.

Public input on the Draft EIS document, alternatives, and impacts was solicited during the summer of 2006 following its publication in early June 2006. Selection of a preferred alternative for US 8 will be made by WisDOT after evaluating engineering and environmental factors for the various alternatives, and careful consideration of comments from various agencies, affected communities and property owners.

Currently, there is no funding for improvement of US 8. The soonest that construction of any improvement along the route could begin is after 2010.

An Environmental Impact Statement (EIS) is the decision document for a major highway project like US 8. The EIS pulls together community and agency interests and recommends a future course of action.

An EIS is required by the National and Wisconsin Environmental Policy Acts for projects with potentially significant social, economic, natural resource and other impacts. The Federal Highway Administration (FHWA) is the lead agency for the EIS which is prepared in accordance with their guidelines.

An important aspect of the FEIS is its designation as a “Tier 1” environmental document. The Tier 1 document is used to outline the basic location and design vision for the 40-mile US 8 corridor between WIS 35 (N) and US 53. Future phases, called Tier 2 and Tier 3, will be used to provide detailed engineering for corridor preservation efforts and eventual design and construction. Additional environmental documentation will also be required. While it could take decades to complete the entire corridor, the preferred alternative for US 8 forms the foundation for WisDOT’s approach to funding and scheduling the highest-need sections of improvements for this corridor.

The FEIS has been published and is available below. Hard copies are available for viewing at the Northwest Region Transportation office, 1701 North 4th Street, Superior, WI.

The following files are in Adobe PDF PDF format. 
(Note: Some files may take longer to download due to file size and individual connection speed.)

Top Return to top

Final EIS

Section 0

  • 0.0 (984 KB)
    • 0.0 Cover
    • 0.0 Executive Summary
  • 0.1 - 0.2 (70 KB)
    • 0.1 Table of Contents
    • 0.2 Glossary of Terms and Acronyms

Section 1

  • 1.1, 1.2 (238 KB)
    • 1.1 Statement of Project Purpose and Need
    • 1.2 Project Background
  • 1.3 Need for Project (490 KB)

Section 2

Top Return to top

Section 3

  • 3.1 Natural Environment (845 KB)
  • 3.2 Socio-Economic Environment (62 KB)
  • 3.3 (579 KB)
    • 3.3 Land Use - Section 1 Figure
    • 3.3 Land Use - Section 1
    • 3.3 Land Use - Section 2
  • 3.4 Other Projects-Potential Influences (286 KB)

Section 4

  • 4.1 (813 KB)
    • 4.1 Direct Effects to Natural Environment - Section 1 Table 4.1.1.3-1
    • 4.1 Direct Effects to Natural Environment - Section 1
    • 4.1 Direct Effects to Natural Environment - Section 2 Table 4.1.1.7-1
    • 4.1 Direct Effects to Natural Environment - Section 2
    • 4.1 Direct Effects to Natural Environment - Section 3
  • 4.2 Direct Effects to Socio-Economic Environment (87 KB)
  • 4.3 Indirect and Cumulative Effects to Land Use (756 KB)
  • 4.4 - 4.8 (230 KB)
    • 4.4 Transportation
    • 4.5 Permits and Approvals
    • 4.6 Irreversible or Irretrievable Commitment Sources
    • 4.7 Energy
    • 4.8 Construction Impacts
  • 4.9 Impacts Summary Table 4.9.1-1 (199 KB)
  • 4.9 Impacts Summary (189 KB)
  • 4.10 - 4.12 (191 KB)
    • 4.10 Secton 4_f_ and 6_f_ Impacts
    • 4.11 Measures to Minimize and Mitigate Adverse Impacts
    • 4.12 Pending Issues and Commitments

Top Return to top

Section 5, 6, 7, 8

  • 5.1-3, 6.1-5, 7.1-5, 8.0 (337 KB)
    • 5.1-3 List of Preparers
    • 6.1-5 Agency Circulation List
    • 7.1-5 Comments and Coordination Prior to the Availability of DEIS
    • 8.0 Index

Appendices

Top Return to top

back Back to US 8 EIS home page


Wetland area near US 8.

Wetland area near US 8.


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index