Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.
WIS 29 (Sunrise Dr.-Business 51 Interchange)
Town of Rib Mountain and village of Rothschild, Marathon County
| View NC, WIS 29 (Sunrise Dr.-Business 51 Interchange) in a larger map. |
![]() |
Location | Overview | Status/phase
Project location
WIS 29 (Sunrise Dr.-Business 51 Interchange), town of Rib Mountain and village of Rothschild, Marathon County.
Project overview
- The existing WIS 29 eastbound and westbound pavement is nearing the end of its useful life and needs to be replaced.
- The bridge decks of the eastbound and westbound bridges over the Wisconsin River and Business 51 are deteriorating and in need of replacement.
- The Sunrise Drive overpass bridge deck needs preventative maintenance to extend its service life. The bridge does not meet current vertical clearance requirements and needs to be raised.
WIS 29 serves multiple communities along with being a regional backbone highway and providing a primary east-west roadway in northern Wisconsin.
Status/phase
Planning began in 2010. Project design began in 2012 and will continue through 2013. Construction is currently scheduled for 2014.
Questions about the content of this page:
WisDOT North Central Region Office, ncr.dtsd@dot.wi.gov
Last modified: June 7, 2013
All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.





