Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

WIS 42 Sister Bay - Need/purpose

What is the purpose of this project?

  • Improve the deteriorating pavement
  • Address roadway safety issues, such as:
    • Vertical deficiencies
    • Substandard intersection angles
  • Improve drainage
  • Increase pedestrian and bicycle accessibility

Project benefits

  • Improving vertical deficiencies, intersection angles and pavement surfaces along WIS 42 will increase safety and efficiency.
  • Adding pedestrian and bicycle facilities within the project corridor will make this type of travel safer and more efficient for tourists and local residents
  • Replacing the existing storm sewer will alleviate current drainage issues that occur during rain events

SSI - Contact info. Questions about the content of this page, contact:
WisDOT Northeast Region Office, ner.dtsd@dot.wi.gov
Last modified: November 22, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.