WIS 96 Fox River Bridge and approaches - Environmental documents

The Environmental Assessment documents the project study limits from County U/County DD intersection on the west and the WIS 96/County D intersection on the east along WIS 96.

WisDOT has identified Alternative 1 as its preferred alternative because it provides the best balance between addressing the projectís key need factors (wider facility, flatter bridge grade, better horizontal and vertical alignment east of the Fox River, safer and more efficient intersections at Fair Street and Broadway Street) and limiting commercial and residential impacts.

The Environmental Report documents the project study limits on WIS 96 from Fox River to Breckenridge Falls Road.

To request a copy of environmental document, contact

Andy Fulcer, WisDOT Project Manager
944 Vanderperren Way
Green Bay, WI 54304
(920) 492-5664
andrew.fulcer@dot.wi.gov

WisDOT environmental information

WisDOT projects and construction sometimes change the natural environment around a project area. To minimize the effects of road construction and development WisDOT works to reduce change to the natural environment and leads several efforts to restore project areas.

SSI contacts Questions about the content of this page, contact:
WisDOT Northeast Region Office, ner.dtsd@dot.wi.gov
Last modified: Mar. 4, 2014

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.