Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

WIS 190 (Capitol Drive) Corridor Study - Environmental documents

WIS 190 east roadway sign in front of Mitchell Park.

Environmental Assessment (EA)

  • EA will be prepared.
  • Documents the need for proposed improvements, alternatives considered and impacts.
  • Required by national and Wisconsin environmental policy acts for projects with potentially significant social, economic, natural resource and other impacts.

Federal Highway Administration (FHWA) is lead agency for the EA, which will be prepared in accordance FHWA guidelines.

EA scheduled for public review/comment fall 2014.

WisDOT environmental information

WisDOT projects and construction sometimes change the natural environment around a project area. To minimize the effects of road construction and development WisDOT works to reduce change to the natural environment and leads several efforts to restore project areas.

SSI - Project contacts Questions about the content of this page, contact:
WisDOT Southeast Region Office, ser.dtsd@dot.wi.gov
Last modified: April 16, 2014

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.