WIS 24 (Janesville Rd.) - Fast facts
Hales Corners, Milwaukee County

Wisconsin 511 travel information
View SE, WIS 24 (Janesville Rd.), in Hales Corners, Milwaukee County. in a larger map.
Map key - Thick orange line is the project overview/location. Blue tear drop with dot in center is the project limit.

Location

WIS 24 (Janesville Rd.), Waukesha County Line to 108th St., in Hales Corners, Milwaukee County.

Overview

Project overview map

  • The roadway will be resurfaced
  • The existing box culvert near 111th Street will be replaced with two separate bridges (one eastbound and one westbound)
  • Constructing left turn lanes to allow for safer turning movements
  • Replace the existing traffic signals at 116th street intersection

Promote your business during construction

Come In We're Open sign

Is your business located within mile of the WisDOT construction zone for this project? If so, help your business not only survive, but thrive, during the construction project. Promote your business by uploading your business information to our business listing website.

Need/purpose

  • The existing pavement is deteriorating and is in need of rehabilitation
  • The existing box culvert is past its useful life and needs to be replaced
  • Traffic signal replacement and the addition of left-turn lanes in the medians will help create a safer condition for vehicles

Schedule

The project is weather dependent with an anticipated start date of April 21 and going until late fall 2014.

Traffic impacts/detours

During construction, WIS 24 will be open to traffic during construction using staged construction techniques.

  • Stage 1
    • Setting up temporary traffic signals at 116th street
    • Building a temporary cross over in the median
    • Working on an overhead sign bridge on the east end of the project
  • Stage 2
    • Traffic will be moved to the outside lanes
    • Inside lanes will have median work, like sewer and lighting improvements along with building turn lanes, etc.
    • Remove half of the box culvert and then replace it with a new bridge
  • Stage 3
    • Traffic will be moved to the inside lanes and construction work will occur on the outside lanes
    • Removing the rest of the box culvert and replacing that with a new bridge
  • Stage 4
    • Shifting traffic as we remove the temporary cross over on the east end
    • Replace the curb and gutter, and median
  • Stage 5
    • Final project clean up
    • Replacing anything else that could not be worked on during the other stages
    • Final landscaping, pavement marking and signing

Please drive safe, slow down, and leave a little bit early as you drive through the construction. And lastly please watch for changing traffic patterns throughout the construction of WIS 24 (Janesville Rd.)

Status/phase

Construction

Contact information

Gary Metzer P.E., WisDOT Project Manager
(262) 548-5685
gary.metzer@dot.wi.gov

Brian DeNeve, WisDOT Southeast Region Communications Specialist
(262) 548-8759
brian.deneve@dot.wi.gov

Wisconsin Department of Transportation (WisDOT)
Southeast Region
141 NW Barstow St.
P.O. Box 798
Waukesha, WI 53187-0798
Phone: (262) 548-5902
Fax: (262) 548-5662
TDD: 711
ser.dtsd@dot.wi.gov

SSI - Project contacts Questions about the content of this page:
WisDOT Southeast Region Office, ser.dtsd@dot.wi.gov
Last modified: March 27, 2014

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.