WIS 50 Reconstruction Project - Need/purpose

Why is this project needed?

WIS 50 has reached the end of its useful life and needs to be reconstructed. This means that all the layers of the highway will be completely replaced.

The proposed WIS 50 corridor improvements are needed to:

  • Address traffic congestion caused by volumes that exceed the roadway’s capacity
  • Reduce crash rates that are above state averages for similar highways
  • Balance the mobility of the corridor with access needs
  • Maintain an important state and local corridor that links economic centers

SSI - Project contacts Questions about the content of this page:
WisDOT Southeast Region Office, ser.dtsd@dot.wi.gov
Last modified: Mar. 5, 2014

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.