Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

I-794 Lakefront Gateway Project - Public involvement

Sign up for project updates

  • Join our distribution list to receive updates and notices via email on I-794 Lakefront Gateway Project.
    • You should receive an email confirming your subscription. Contact the WisDOT Southeast Region Office, ser.dtsd@dot.wi.gov if you have difficulties or questions about subscribing.

Public Involvement Meetings (PIM), hearings and other meetings

Scheduled/future

  • June 20, 2014 - 60 percent preliminary engineering plans complete anticipated
  • Feb. 1, 2015 - Final construction plans complete anticipated
  • Summer 2015 - PIM anticipated

Past meetings

  • May 13, 2014 - PIM, Open house format allowing participants to view concepts and provide feedback on: How proposed plans affect Milwaukee County park lands, Development of bicycle/pedestrian facilities, Preferred alternative for the roadway layout, and Master Plan concepts
    • Handout
    • Maps from this meeting
    • View all items from this meeting (16.9 MB)
      • Overview
      • Handout
      • Schedule
      • Comment sheet Note - Comments were due May 27, 2014
      • Preferred alternative
      • Existing and projected average annual daily traffic (AADT) volumes
      • Overview perspective
      • North Lincoln Memorial Drive
      • East Clybourn Street
      • Proposed BMPs and stormwater opportunities
      • Proposed BMPs and stormwater details
      • Retaining walls, Summerfest
      • Retaining walls, Historic Third Ward
      • Lakefront park land
      • Existing lakefront multiuse trails
      • Proposed lakefront multiuse trails
      • Preferred alternative, with proposed multiuse trails
      • Typical sections, 1 of 2
      • Typical sections, 2 of 2
      • Multiuse trail connections, Discovery World
      • Multiuse trail connections, Summerfest
      • East Clybourn Street extension
      • N. Harbor Drive
      • Design concept A site layout
      • Design concept B site layout
      • Design concept B, perspective 1
      • Design concept B, perspective 2
      • Design concept C site layout
      • Design concept C, perspective 1
      • Design concept C, perspective 2
      • Design concept D site layout
      • Design concept D, perspective 1
      • Design concept D, perspective 2
      • Bridge aesthetic concepts
  • Feb. 14, 2014
  • Jan. 22, 2014 - PIM

News releases

Stakeholders/committees

  • Long Range Lakefront Plan
  • The project team created a Community Advisory Group (PAG) in November 2013
  • Project team will be meeting with property owners upon request

Project comments

WisDOT welcomes project comments/suggestions. Please give us your comments/suggestions on this project, the project goals, transportation deficiencies, project purpose and need, and preliminary alternatives. Thank you for your interest and assistance with this important project.

  • Submit comments at PIMs and/or other public meetings
  • Send project comments via email to project staff

SSI - Project contacts Questions about the content of this page:
WisDOT Southeast Region Office, ser.dtsd@dot.wi.gov
Last modified: June 23, 2014

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.