Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.
US 12 (WIS 23 (Munroe Ave.)-WIS 13 (Broadway St.)), aka Wisconsin Dells Parkway - Public involvement
Sign up for project updates | PIM/hearings | PAG meetings | News releases | Newsletters/others | Stakeholders | Comments
Sign up for project updates
- Join our distribution list
to receive updates and notices via email on
US 12 (WIS 23 (Munroe Ave.)-WIS 13 (Broadway St.)), aka Wisconsin Dells Parkway.
- You should receive an email confirming your subscription. Contact Jeremy Krachey if you have difficulties or questions about subscribing.
Public information meetings (PIM), hearings and other meetings
Scheduled/future
- Project team will meet with property owners upon request
The following document(s) are in Adobe PDF
format.
(Note: Some files are large and may take longer to download
depending on individual connection speeds. Users may need to zoom in
to see details.)
Past meetings
2013
- Jan. 22, 2013 - PIM
- Handouts
- Comment sheet Note - Comments due Feb. 8, 2013
- Alternatives
- Meeting info.
- Project summary displays
- Maps from this
meeting
- Existing conditions
- Crash summary
- Access management
- Alternative layouts
- Alt 1, 4-lane undivided
- Alt 2, 4-lane divided with median
- Alt 4A, One way couplet (small loop)
- Alt 4B, One way couplet (medium loop)
- Alt 4C, One way couplet (large loop)
- Handouts
2011
- Dec. 13, 2011 - PIM
Public Advisory Group (PAG) meetings
A Public Advisory Group (PAG) was created summer 2012 to solicit feedback throughout the roadway planning process. It conducted its first meeting Sept. 6, 2012.
The group is comprised of local residents, business owners, and local and state agencies. These stakeholders represent a diverse set of interests that will assist the design team to assure a comprehensive set of alternatives are considered through the study process.
Scheduled/future
- Jan./Feb. 2013 - Evaluate alternatives
- May 2013 - Refine alternatives
- Fall 2013 - Preferred alternative
- Summer 2014 - Revisions to the preferred alternative
- Fall 2014 - Brainstorming on construction concerns
Past meetings
2012
- Dec. 12, 2012 - PAG mtg. 3
- Oct. 10, 2012 - PAG mtg. 2, Definition of study goals and evaluation criteria, transportation planning concepts, design charette
- Sept. 6, 2012 - PAG mtg. 1, Existing corridor context, vision exercise, Transportation Planning 101
News releases
Newsletters/others
Stakeholders/committees
- Public
- Area businesses
- Wisconsin Dells Visitor & Convention Bureau
- Public Advisory Group (PAG)
Project comments
WisDOT welcomes project comments/suggestions. Please give us your comments/suggestions on this project, the project goals, transportation deficiencies, project purpose and need, and preliminary alternatives. Thank you for your interest and assistance with this important project.
- Submit comments at PIMs and/or other public meetings
- Print, fill out, and submit the general Comment sheet
- Note - Comments on the alternatives due Feb. 8, 2013.
- Send project comments via email to project staff
Public involvement info.
Information on ways the public/businesses can and are encouraged to participate in projects.
Questions about the content of this page, contact:
WisDOT Southwest Region Office-Madison, swr.dtsd@dot.wi.gov
Last modified: June 18, 2013
All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.



