US 12 Corridor - Schedule

Note - WisDOT has stopped all work on the study of a future US 12 Bypass through the town of Koshkonong south of Fort Atkinson. The final disposition of the study will be determined at a future date by the Transportation Projects Commission. (May 3, 2012)

For more information on Public Involvement Meetings (PIM), hearings and other public activities, visit Public involvement.

Current (this year)

  • May 3, 2012 - WisDOT has stopped all work on the study of a future US 12 Bypass through the town of Koshkonong south of Fort Atkinson. The final disposition of the study will be determined at a future date by the Transportation Projects Commission.

Future (next year and beyond)

  • 2016 - Interim improvements to existing US 12
  • To be determined (TBD)
    • Publication of the Final Environmental Impact Statement (FEIS)
    • Record of Decision (ROD) signed
    • Study scheduled to be completed
    • Officially map future bypass corridor
    • When traffic and safety conditions warrant the need to construct the bypass, the EIS will be re-evaluated to account for any changes in conditions. This would be done before construction can begin.
    • A public hearing will be held prior to recording the official map


Past (anything prior to today)

2012

  • May 3, 2012 - WisDOT has stopped all work on the study of a future US 12 Bypass through the town of Koshkonong south of Fort Atkinson. The final disposition of the study will be determined at a future date by the Transportation Projects Commission.

2011

  • Announcement of Preferred Alternative, South Bypass
  • Completion of impacts analysis of south bypass, preparation of FEIS
  • Oct. 13, 2011 - PIM

2008

  • 2008-2011 - Impacts analysis of south bypass, preparation of FEIS

2007

  • Dec. 2007 - Announcement of three step preferred concept
  • Apr.-Aug. 2007 - Additional studies, public and agency coordination, and alternatives analysis. PIM.
  • Dec. 2006-Apr. 2007 - Response to Draft EIS (DEIS) comments

2006

  • Dec. 2006-Apr. 2007 - Response to DEIS comments
  • Jan.-Dec. 2006 - Additional studies and agency coordination post-DEIS

2005

  • Nov. 2005 - Public Hearing
  • Nov. 2003-Nov. 2005 - Conduct studies and prepare DEIS on alternatives conducted for further study

2004

  • Nov. 2004 - PIM

2003

  • Nov. 2003-Nov. 2005 - Conduct studies and prepare DEIS on alternatives conducted for further study
  • Jul.-Nov. 2003 - Analysis of broad range of alternatives
  • Apr. 2003 - PIM
  • Feb.-Jul. 2003 - Develop purpose and need statement
  • Sep. 2002-Feb. 2003 - Agency and public scoping period

2002

  • Oct. 2002 - PIM
  • Sep. 2002-Feb. 2003 - Agency and public scoping period
  • Sep. 2002 - Notice of intent to prepare DEIS

Top Return to top

Questions about the content of this page:
WisDOT Southwest Region Office-Madison, swr.dtsd@dot.wi.gov
Last modified: June 18, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.