US 14/WIS 11 Corridor Study - Environmental information

Wild lupine along a roadway.

The following document(s) are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Data gathering

Initial phase of the study, data was gathered about a variety of issues in the study area:

  • Existing traffic volumes
  • Crash rates
  • Historical and archaeological sites
  • Potential hazardous materials sites
  • Areas of prime farmland
  • Info. on other natural and cultural resources in the project area.

Results of data gathering

Purpose and need statement

A project purpose and need statement was developed in coordination with local officials and state and federal agencies.

Finding of Independent Utility

Executive summary

Finding of Independent Utility (complete) (12.6 MB)

In order to split the study into west and east components, documentation was required to demonstrate that each study:

  • Connects logical termini
  • Have independent utility
  • Not restrict consideration of alternatives

Environmental process

Environmental Impact Statement (EIS)

National Environmental Policy Act (NEPA) requires an EIS for all major Federal actions that significantly affect the quality of the human environment. An EIS is the decision document for a major highway project like US 14/WIS 11. The EIS pulls together community and agency interests and recommends a future course of action.

EIS main parts:

  • Purpose and need for the proposed action
  • Alternatives
  • Environmental consequences

Note - EIS will be completed for west segment only. East segment alternative analysis and EIS preparation will begin at a later date; after west segment EIS is complete.

Draft Environmental Impact Statement (DEIS)

First version is a Draft EIS (DEIS). DEIS discusses the 'no-build' alternative and a range of reasonable 'build' alternatives along with their impacts.

Final Environmental Impact Statement (FEIS)

Second version is a Final EIS (FEIS). FEIS documents the recommended alternative and reasons for its selection.

Record of Decision (ROD)

ROD is final approval that is needed before an action analyzed in EIS may be implemented. The Federal Highway Administration (FHWA) is lead agency and an EIS is prepared according to their guidelines.

WisDOT environmental information

WisDOT projects and construction sometimes change the natural environment around a project area. To minimize the effects of road construction and development WisDOT works to reduce change to the natural environment and leads several efforts to restore project areas.

Questions about the content of this page:
WisDOT Southwest Region Office-Madison, swr.dtsd@dot.wi.gov
Last modified: June 21, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.