Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

US 51, Stoughton Rd. Corridor Study - Alternative A

Adds capacity to intersections and improves mobility without additional traffic lanes or interchanges.

  • Convert US 12/18 (Beltline) interchange to a Diverging Diamond Interchange (DDI)
  • Construct Modified Echelon Interchange at Broadway
  • Relocate frontage roads at the Pflaum Rd. and Buckeye Rd. intersections
  • Convert WIS 30 interchange to a DDI
  • Construct Echelon Interchange at East Washington Ave.

Note - A full description of Alternative A is below.

Maps

Updated Updated alternative description and summary maps to be included in the Draft EIS (DEIS)

March 19, 2013 PIM

View all Mar. 19, 2013 PIM documents/exhibits/maps

Questions about the content of this page:
US 51 Stoughton Road Study Team, us51stoughtonrdstudy@dot.wi.gov SSI - Contacts
Last modified: May 12, 2014

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.