Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

US 51, Stoughton Rd. Corridor Study - Alternative C

Provides a free-flow movement for traffic through the corridor.

  • Includes interchanges at the following locations (as listed in Alternative B)
    • Pflaum Rd.
    • Buckeye Rd.
    • Lexington Ave./Commercial Ave.
    • East Washington Ave.
    • Hoepker Rd.
  • and at
    • Terminal Dr./Voges Rd.
    • Kinsman Blvd.
    • Rieder Rd.
    • Amelia Earhart Dr.
  • Free flow ramps from southbound US 51 to westbound US 12/18 (Beltline) and from the eastbound Beltline to northbound US 51
  • Includes express lanes over US 12/18 and express lanes over WIS 30/railroad crossing/Lexington Ave.

Maps

Updated Updated summary maps to be included in the Draft EIS (DEIS)

March 19, 2013 PIM

View all Mar. 19, 2013 PIM documents/exhibits/maps

Questions about the content of this page:
US 51 Stoughton Road Study Team, us51stoughtonrdstudy@dot.wi.gov SSI - Contacts
Last modified: May 12, 2014

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.