Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

US 51 Corridor Study
Stoughton-McFarland, Dane County

View SW, US 51 Corridor Study, I-39/90 (Stoughton) to US 12/18 (McFarland) in a larger map.
Map key - Thick orange line is the project overview/location. Green line is project alternative corridor. Blue tear drop with dot in center is the project boundary.

Project location

US 51, I-39/90 (east of Stoughton) to US 12/18 (Beltline) north of McFarland, in Dane County.

Project overview

This 18.4 mile segment has two major components:

Environmental Impact Statement (EIS)

  • Evaluate long-term alternatives to address safety and improve traffic flow within the corridor.
  • Short-term improvements will be implemented on an ongoing basis as resources permit.

Needs Assessment (NA)

  • Completed Feb. 2004, in-depth NA study reviewed and analyzed transportation needs along US 51, Burma Rd. in McFarland to east side of Stoughton.
  • The study indicated there was sufficient need to study potential improvement alternatives.

Status/phase

  • EIS study - Long-term planning with no scheduled construction activity.

Questions about the content of this page:
WisDOT Southwest Region Office-Madison, swr.dtsd@dot.wi.gov
Last modified: Mar. 26, 2014

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.