US 12/14 West Beltline Modifications (University Ave.-Mineral Pt. Rd.) - Project details

Terrace Ave. to Greenway Blvd.

  • Widening the outside shoulders of both the eastbound and westbound lanes.
  • The median shoulders will be widened to accommodate construction staging and a median barrier.
  • New pavement will be installed on the eastbound and westbound travel lanes
  • Mainline roadway profile will be raised in both directions.
  • Eastbound and westbound Greenway Blvd. exit ramps will be modified to better blend with mainline travel lanes.

  • An additional right turn lane on the eastbound exit ramp will be added at the Greenway Blvd. interchange.
  • Right-of-way acquisition will be required to accommodate the improvements.
  • Wetlands are located in the northwest quadrant of Greenway Blvd. interchange. A delineation will be completed to determine the extent, if any, of the potential project impacts.

Greenway Blvd. to Old Sauk Rd.

  • Widening the outside shoulders in both mainline directions.
  • Median shoulders will be widened to accommodate construction staging and a median barrier.
  • Mainline roadway profile will be raised in both directions
  • New pavement in the eastbound and westbound travel lanes will be installed.
  • Westbound Greenway Blvd. and eastbound Old Sauk Rd. parallel exit ramps will be extended.

  • Right turn lane on the westbound Greenway Blvd. exit ramp will be lengthened.
  • Similarly, the ramps for eastbound Greenway Blvd. and westbound Old Sauk Rd. parallel entrance ramps will be extended.
  • Eastbound and westbound Greenway Blvd. and Old Sauk Rd. exit ramps will be modified to better blend with mainline travel lanes.
  • Traffic signal equipment at the exit ramp terminals will be relocated.

Old Sauk Rd. to Mineral Point Rd.

  • Adding auxiliary lanes along the outside of the existing eastbound and westbound travel lanes.
  • Mainline roadway profile will be raised in both directions.
  • New pavement in the eastbound and westbound travel lanes (south of Old Sauk Rd. interchange heading north) will be installed.
  • The outside shoulders next to auxiliary lanes in both directions will also be widened.
  • A concrete barrier along outside shoulders will be installed to avoid the need for additional right-of-way acquisition.

  • A median barrier will be constructed.
  • Entrance ramp for eastbound Old Sauk Rd. will be widened to accommodate two lanes of queuing, and ramp metering will be installed.
  • Four sign structures, two in the eastbound and two in the westbound direction, will be installed.
  • The addition of the auxiliary lanes will require the completion of a noise analysis to determine if there are potential impacts to adjacent properties.

Mineral Point Rd. to Gammon Rd.

  • Entrance ramp for eastbound Mineral Point Rd. will be widened to accommodate two lanes of queuing, and ramp metering will be installed.
  • Beam guard will be installed along this section
  • Retaining wall may be installed to prevent the need for right-of-way acquisition.

Other Improvements

  • Grading and slope improvements to accommodate roadway widening and drainage throughout entire project (median and outside) will occur.
  • Culverts will be replaced as needed along the corridor.
  • Two ground-mounted dynamic-message signs will be installed beside the travel lanes north of Old Sauk Rd. and north of University Ave.
  • A crash investigation pad and law enforcement pad will be constructed near Old Sauk Rd. to provide incident management.
  • Esser Pond is located adjacent to the northwest quadrant of the Greenway Blvd. interchange. Although strip acquisition of right-of-way may be required at this location, the grading limits are not expected to extend beyond the existing fence line, which coincides with the existing right-of-way.

  • Eastbound and westbound Greenway Blvd. exit ramps will be modified to better blend with mainline travel lanes.
  • An additional right turn lane on the eastbound exit ramp will be added at the Greenway Blvd. interchange.
  • Right-of-way acquisition will be required to accommodate the improvements.
  • Wetlands are located in the northwest quadrant of Greenway Blvd. interchange.
  • A delineation will be completed to determine the extent, if any, of the potential project impacts.

Top Return to top

SSI - Project contacts Questions about the content of this page:
WisDOT Southwest Region Office-Madison, swr.dtsd@dot.wi.gov
Last modified: October 22, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.