skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

US 10 project

Purpose

State highway changes

Schedule

Maps

Public involvement

Contacts

US 10 expansion - public involvement

Meetings | Hearings | News releases | Newsletters/others

Highway projects are developed cooperatively by the public, state and federal review agencies and Wisconsin Department of Transportation (WisDOT).

Preparing an expansion project like US 10 takes several years and extensive effort is always made to keep the public involved and informed.

Environmental studies and preliminary design for US 10 began in 1990. The final environmental impact statement (FEIS) for Trestik Road to I-39 was completed in 2004. The Record of Decision (ROD) was approved in May 2005, which allowed WisDOT to begin real estate acquisition and final design. An environmental assessment (EA) for the segment between Wood County B and WIS 34 south was completed in 2005 with a Finding of No Significant Impact (FONSI) completed in January 2007.

Design of each of the construction projects begins approximately three years prior to construction. Final design includes detailed engineering and data gathering needed for the development of construction plans.

Contact with property owners regarding right of way acquisition begins approximately one to two years prior to construction of each project segment.

The following documents are in Adobe PDF PDF format.

Public information meetings (PIM) and hearings

Scheduled/future

  • There are no scheduled meetings to report on at this time.

Past meetings

  • June 9, 2009 - PIM was conducted.
  • June 3, 2008 – PIM was conducted to discuss current construction projects and remaining design projects. A public hearing was conducted regarding the proposed delegation of US 10 in Wood County (between WIS 13 and the Portage County line) as an expressway.
  • April 24, 2007 - PIM was conducted discuss the current construction projects and remaining design projects.
  • November 10, 2005 - PIM was conducted to focus on the US 10 environmental study between Wood County B and WIS 34 south.
  • November 3, 2005 - PIM was conducted to focus on the final design of US 10 from Portage County N to I-39.
  • February 15, 2005 - PIM was conducted regarding the proposed WIS 13/80 rerouting.

Public hearings and other meetings

  • June 3, 2008 – Public hearing was conducted regarding the proposed delegation of US 10 in Wood County (between WIS 13 and the Portage County line) as an expressway.
  • April 2007 - Public hearing was conducted.
  • March 2 and March 3, 2005 - Public hearings were conducted for the environmental document between Wood County B and WIS 34 south.

News releases

Newsletters/others

Top Return to top


 


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index