skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

US 51 corridor

Central segment

Need

Short-term improvements

Alternatives analysis

Traffic impacts

Schedule

Map

Public involvement

Contacts

US 51 central segment - Stoughton Road: Alternative A

Alternative A adds capacity to intersections and improves capacity without additional 
traffic lanes or interchanges. Turn lanes are added or extended; signals between 
Buckeye Road and the Beltline are coordinated, and frontage roads are added or moved 
to enhance mobility in the corridor. The most significant changes are the relocation of 
the Broadway intersection, re-design of the frontage road intersections at Pflaum Road 
and Buckeye Road, and signalization or roundabout treatment of the Hoepker Road 
intersection with additional turn lanes.  

Map of Alternative A PDF (2.6 MB)

Back Back to US 51 central segment alternatives analysis


Drivers & Vehicles | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index