Wisconsin Department of Transportation

Alert: The following services will be unavailable on Saturday, January 5, 2013 from 12 a.m. (midnight) to 6 a.m. CST due to system maintenance.

US 53 Corridor Preservation Study
Northern Douglas County Area (WCL Railroad to Superior) - Alternatives

Nov. 13, 2013 PIM - Moccasin Mike Rd. intersection alternatives

Dec. 13, 2011 PIM - Design alternatives for intersection improvements along this study area

County L

Note - Items denoted with a * have been eliminated from further consideration.

Hagman and Bennett Road

These are needed in conjunction with County L alternatives 2 - 6 above.

County B

18th Street Road alteration

This is needed in conjunction with County B alternatives 2 - 6 above.

US 2/53 and County C

Bayfield Road alteration

This is needed in conjunction with US 2 alternatives 2 - 9 above.

County E/Moccasin Mike Road

Alternative impact matrix

Comments

To comment on any or all of the alternatives, contact:

Marc Bowker, WisDOT Planning Engineer
(715) 635-4975
marc.bowker@dot.wi.gov

SSI - Project contacts Questions about the content of this page, contact:
WisDOT Northwest Region Office, nwr.dtsd@dot.wi.gov
Last modified: December 11, 2013

All external hyperlinks are provided for your information and for the benefit of the general public. The Wisconsin Department of Transportation does not testify to, sponsor or endorse the accuracy of the information provided on externally linked pages. Some pages contain links to other documents and media types (PDF, Word, Flash, Video, etc.) and require free plugins to work. Visit our software information page for assistance.