skip navigation Wisconsin Department of Transportation
Wisconsin Department of Transportation Logo
Plans and Projects
 
DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

WIS 96 (County U - County D) Fox River Bridge and Approaches Corridor

Need/purpose

Schedule

Maps

Environmental documents

Public involvement

Project updates

Contacts

WIS 96 (County U - County D) Fox River Bridge and Approaches Corridor - Maps

Study overview/location

WIS 96, County U (County Line Rd./Lock Rd.) - County D (Plum Rd.), in village of Wrightstown, in Brown County.

Note: If you are having problems viewing or printing any of the maps/displays below, please contact Natasha Gwidt, WisDOT Project Manager.

Map key - Thick orange line is the project overview/location. Blue tear drop with dot in center is the project boundary.
View NE, WIS 96 (County U - County D) Fox River Bridge and Approaches Corridor in a larger map

The following documents are in Adobe PDF PDF format.
(Note: Some files are large and may take longer to download depending on individual connection speeds. Users may need to zoom in to see details.)

Jul. 27, 2011 - Public hearing exhibits/maps

  • Preferred alternative (1.4 MB) - Alternative 1, the preferred alternative, to be carried through the remainder of the environmental study.
    • It is aligned along Broadway St. west of the Fox River.
    • It will address the grade problems at the Canadian National Railroad crossing and improve the intersection with Main St.
    • It crosses the Fox River south of the existing bridge and will cross over Washington St. and a portion of the Plum Creek wetlands on structure before tying into a new intersection at Fair St.
    • Existing High St. will be used as the connection between Washington St. (County Z) and the new bridge crossing.
    • Roundabouts are being considered at the intersections with Main St. and Fair St.
  • Proposed bridge typical section

Alternatives

Jun. 23, 2010 - Public information meeting (PIM) and region selection meeting exhibits/maps, two remaining alternatives considered

Jan.–Mar. 2010 - Screening of Alternative 1 options

Nov. and Dec. 2009 - Project Advisory Committee meeting and presentation to the village board exhibits/maps, Two remaining alternatives

Jun. 11, 2009 - PIM exhibits/maps

  • Six remaining alternatives overview (316 KB)
  • Six remaining alternatives (1.7 MB)
    • Alternative 1, Bridge over Washington St.
    • Alternative 2, At-grade intersection with Washington St.
    • Alternative 3, At-grade intersection with Washington St.
    • Alternative 4, Bridge over Washington St.
    • Alternative 5, At-grade intersection with Washington St.
    • Alternative 5, Bridge over Washington St.
    • Alternative 6, Bridge over Washington St.

back Back to Home

back Back to Public involvement

Top Return to top


 


DMV | Safety | Travel | Plans & Projects | State Patrol | Doing Business | Programs for Local Gov't

Air | Bicycles | Bus/transit | Cars | Motorcycles | Pedestrian | Rail | Trucks | Waterways

Home | News | About Us | Research & Library | A-Z Index